2023 BMW M4 Competition at Medina Auto Mall
https://ram.medinacdjr.com/cars/Used/2023/BMW/M4/Competition/174141162023 BMW M4 Competition
Selling Price : $74,945
Photo Gallery
Vehicle Basics
Additional Savings
- Condition : Used
- Mileage : 33,939
- VIN : WBS43AZ05PCM56207
- Stock # : G261921A
- Engine :
- Transmission : 8-Speed Automatic Steptronic
- Ext. Color : Gray
- Int. Color : Black
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
22
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Skyscraper Gray Metallic 2023 BMW M4 Competition AWD 8-Speed Automatic Steptronic Clean CARFAX. 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp M4 Competition, 2D Coupe, 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp, 8-Speed Automatic Steptronic, AWD, Skyscraper Gray Metallic, Black w/Full Merino Leather Upholstery.
For the most up-to-date and accurate pricing, please visit www.medinaautomall.net. Third-party pricing may not always be accurate. Pricing includes all applicable rebates assigned to the dealer. Contact Medina Auto Mall to verify there is not a pending sale.
For the most up-to-date and accurate pricing, please visit www.medinaautomall.net. Third-party pricing may not always be accurate. Pricing includes all applicable rebates assigned to the dealer. Contact Medina Auto Mall to verify there is not a pending sale.
Vehicle Features
- Navigation System
- Executive Package
- 16 Speakers
- AM/FM radio: SiriusXM
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Head-Up Display
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote Engine Start
- Remote keyless entry
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- M Compound Brakes w/Red Calipers
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Power Tailgate
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Icon Adaptive LED Headlights w/Laserlight
- M Shadowline Lights
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- Carbon Fiber Trim
- Compass
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Enhanced USB/Bluetooth Plus Smartphone Integration
- Front reading lights
- Garage door transmitter
- Heated Steering Wheel
- Illuminated entry
- Leather Shift Knob
- Live Cockpit Pro w/Navi
- M Drive Professional
- Outside temperature display
- Overhead console
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Front Ventilated Seats
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.